- Other Business Services[2]
- Energy Projects[5]
- Environment Projects[1]
- Crude Oil[4]
- Other Industrial Fuel[4]
- Other Energy Related Products[3]
- Other Environmental Products[2]
- Chemical Waste[2]
- Other Recycling Products[10]
- Waste Paper[2]
- Waste Management[10]
- Energy Saving Equipment[10]
- Other Metal Processing Machinery[1]
- Other Machinery[1]
- Plastic Recycling Machinery[10]
- Rubber Processing Machinery[10]
- Plastic Processing Service[2]
- Plastic Projects[4]
- PC[2]
- PET[4]
- PVC[1]
- Recycled Plastic[10]
- Recycled Rubber[10]
- Rubber Processing Service[1]
- Rubber Projects[1]
- Polyurethane Rubber[3]
JZG043 No stress deformation and Horizontal waste incineration power plant
1.Tubing part aad graphite circle, reduce the friction
2.Long life
3.Waste gas recycling
4.Fast delivery time
JZG043 No stress deformation and Horizontal waste incineration power plant
The raw materials
waste tire,waste plastic,waste rubber
The out put product
the crude oil
the carbon black
the steel wire
Equipment Power
Name | Power |
Reactor motor/Reducer motor | 3 KW/4kw |
Draft fan | 4 KW |
Blower*3 | 250 W*3 |
Cooling tower | 3kw |
This chart is according to our home electrical connection.
So we will produce the machine according to your country electrical connection.
the water consumption
Our equipment includes the cooling power.The water consumption is 2%.If in winter, it will be 0.5~0.1%.
If you use the recycle,it will need the more water.
Fuel Oil Parameters
NO. | Project | Car Tire Oil | Truck Tire Oil | Plastic Oil |
1 | Water content | 3%~5% | 3%~5% | 3%~5% |
2 | Sulfur content | 0.01% | 0.01% | / |
3 | Density(g/ml) | 0.88 | 0.84 | 0.84~0.86 |
4 | Cetane No. | 45 | 40 | / |
5 | Combustion value | 10500 | 9500 | 9500 |
6 | Asphalt | 0.5% | 0.5% | / |
7 | Ash | 1% | 1% | ≈0.8% |
8 | Impurity | 1%~3% | 1%-3% | / |
9 | Solidifying point | -100C | -50C | +100C |
10 | Flash point | 500C | 300C | 300C |
11 | Viscosity(mm2/s) | 5 | 6 | 8 |
Note
MOQ:1set
Payment term:
30% T/T in advance, the balance paid before shipment
Delivery time
We can guarantee the delivery time.You will delivery time after your payment.
The delivery time is 20~30 working days