- Other Business Services[2]
- Energy Projects[5]
- Environment Projects[1]
- Crude Oil[4]
- Other Industrial Fuel[4]
- Other Energy Related Products[3]
- Other Environmental Products[2]
- Chemical Waste[2]
- Other Recycling Products[10]
- Waste Paper[2]
- Waste Management[10]
- Energy Saving Equipment[10]
- Other Metal Processing Machinery[1]
- Other Machinery[1]
- Plastic Recycling Machinery[10]
- Rubber Processing Machinery[10]
- Plastic Processing Service[2]
- Plastic Projects[4]
- PC[2]
- PET[4]
- PVC[1]
- Recycled Plastic[10]
- Recycled Rubber[10]
- Rubber Processing Service[1]
- Rubber Projects[1]
- Polyurethane Rubber[3]
JZG060 Container or Frame packing gas incinerator
1.high oil yield rate
2.100% wastage recycling is achieved
3.Creates economically valuable products out of waste tyres
JZG060 Container or Frame packing gas incinerator
The raw materials
waste tire,waste plastic,waste rubber
The out put product
the crude oil
the carbon black
the steel wire
Fuel Consumption (PER BATCH)
Fuel | Wood | Coal | Natural Gas | Crude Oil |
Consumption | 400KG | 200KG | 75-85KG | 100KG |
Process time
——16~18hours
Process | Hour |
Loading time | 2h |
Fuel burning time | 4~6h |
Cooling time | 6~8h |
arbon black & steel wire slagging | 1~2h |
Specification
NO. | Item | Content | ||
1 | equipment’s model | YL-05 | YL-08 | YL-10 |
2 | Machine dimension(mm) | D2200*L5000 | D2200*L6000 | D2600*L6600 |
3 | Daily Handling capacity | 5 tons | 8 tons | 10 tons |
4 | Structure Form | Horizontal type | Horizontal type | Horizontal type |
5 | Working pressure | Normal pressure | Normal pressure | Normal pressure |
Note
MOQ:1set
Payment term:
30% T/T in advance, the balance paid before shipment
Delivery time
We can guarantee the delivery time.You will delivery time after your payment.
The delivery time is 20~30 working days